Expo Line runs between King George Station @ Platform 2 and Waterfront Station @ Platform 1. 10 active alerts right now — see below.
Starting November 3, 2026, the elevator serving Patterson Station will be closed for replacement. Work is expected to be complete Spring of 2027. Please allow for up to 30 minutes additional trip time to complete detours as needed.
Customers who require elevator access can use the following alternative travel options:
-From Patterson Station, customers can travel east along the BC Parkway to Central Boulevard and Willingdon Avenue, and catch buses #19, #31, #49, #116, or #130 to Metrotown Station.
-Customers can also continue travelling east along the BC Parkway to the accessible entrance at Metrotown Station.
-From Patterson Station, travel north on Patterson Avenue to Kingsway and take the #19 Kingsway bus to the Metrotown Station bus loop
-Customers using the #129 bus can connect to the SkyTrain network at Gilmore Station on the Millennium Line.
Starting October 20, 2026, the elevator serving Platform 1 at King George Station Station will be closed for replacement. Work is expected to be complete Spring of 2027. Please allow 20 minutes additional trip time to complete detours as needed.
Use the King George Platform 2 elevator when available. Train announcements when arriving at Surrey Central will advise if the elevator at King George is out of service.
Take the R1 RapidBus from Surrey Central to King George from Bay 11.
Customers starting their trip at King George Station can use the King George Platform 2 elevator when available or take the R1 RapidBus (or any other bus) to Surrey Central from Bay 4.
Customers starting their trip at King George Platform 2 should plan up to 20 minutes extra travel time for their train to travel from Platform 2 to Platform 1 before departing towards Waterfront, or for the bus connection to Surrey Central.
Elevator at Expo Line 29th Avenue Station from 29th Ave entrance to the platform is temporarily out of service beginning Tue Sep 29 due to replacement.
To increase accessibility between stations a special shuttle service called Accessible Shuttle will be implemented
This service will run between 29th and Joyce Stations on weekdays (excluding holidays) during peak hours to help customers connect between SkyTrain and bus services.
The shuttle will run approximately every 15 minutes on weekdays during the following hours (excluding holidays and weekends):
• 6 a.m. to 9 a.m.
• 3 p.m. to 6:30 p.m.
Customers traveling from 29th Avenue Station bus loop requiring access to SkyTrain can board the Accessible Shuttle from Bay 2 (Stop #51603) at 29th Avenue Station for a direct connection to Joyce–Collingwood Station and SkyTrain service during shuttle operating hours.
Customers traveling from Joyce–Collingwood Station SkyTrain to bus connections at 29th Avenue Station can board the Accessible Shuttle from Bay 8 (Stop 60285) located on the far-east side of the bus loop at Joyce–Collingwood Station for service to 29th Avenue Station and
Starting July 28, 2026, the elevator serving Royal Oak Station will be closed for replacement. Work is expected to be complete Fall 2026. Please allow 30 minutes additional trip time to complete detours as needed.
To connect to SkyTrain from street level at Royal Oak, catch the #148 Edmonds Station bus from bus stop #59781 on Beresford Street.
To get to street level at Royal Oak from SkyTrain, catch the #148 Royal Oak Station bus from Edmonds Station Bay 7.
Starting July 21, 2026, the elevator serving Burrard Station will be closed for replacement. Work is expected to be complete Spring of 2027. Please allow 20 minutes additional trip time to complete detours as needed.
Connections to/from SkyTrain and Burrard Station are available via:
Bus
- Catch the #5 Downtown bus from Burrard Bay 7, across the street from the main station entrance. Disembark at the intersection of Cambie and Dunsmuir streets. From here, travel one block south to Stadium-Chinatown Station.
- Catch the #5 Robson from the intersection of Cambie and Dunsmuir streets, one block northwest from the station entrance. Disembark at Burrard Station Bay 1.
Street level
-Travel along Dunsmuir Street between Burrard and Granville Station’s accessible entrance, located just southeast of Granville Street.
Reduced service & temporary platform assignments are in effect between Braid & Lougheed stations. Please plan for an extra 12 minutes of travel time if travelling on Expo Line to Sapperton, Braid, Lougheed or Production Way stations.
Some transfers may be required at Braid Station to continue towards Production Way-University Station.
Frequency daily until 9:30 PM:
Expo Line trains between Waterfront Station and Braid Station will operate every 6 minutes.
Expo Line trains to and from Production Way station will operate every 12 minutes.
After 9:30 PM Expo Line trains to and from Production Way station will operate every 12 minutes. Trains will no longer terminate at Braid Station.
Expo Line trains between Waterfront Station and King George Station will operate at regular frequency on all days.
Millennium Line and Canada Line are unaffected.
Construction work is anticipated to be completed allowing regular SkyTrain service to resume in summer 2027.
Read more at:
The centre escalator by the Granville Mall at Expo Line Granville Station is temporarily out of service beginning at 5:35 AM due to repairs.
The down escalator at Expo Line Commercial-Broadway Station from platforms 3 & 4 (Expo Line) to the Compass vending machine level is temporarily out of service beginning at 5:25 AM due to repairs.
The down escalator (West Stn House) at Expo Line Metrotown Station from platform level to the McKay Ave entrance is temporarily out of service beginning at 5:25 AM due to repairs.
LIM rail replacement project: SkyTrain service between Waterfront and Commercial-Broadway stations will be impacted on Saturday and Sunday mornings. Customers should allow for 20 minutes extra trip time.
From July 25, 2026 until February 2027, SkyTrain service between Waterfront and Commercial-Broadway stations will be impacted the following days and times:
-Saturdays from start of service to 10:15 a.m.
-Sundays from start of service to 10:15 a.m. and 9:30 p.m. until the end of service.
Please allow for 20 minutes extra trip time during these periods if traveling downtown.
Check digital screens at station entrances for platform changes. Customers should board the first available train toward their destination and transfer if needed.
For more information please visit TransLink.ca/railreplacement
Millennium Line and Canada Line are unaffected.
Connecting…
Stations and next train times
- 57964Waterfront Station @ Platform 2
- 60826Burrard Station @ Platform 2
- 57966Granville Station @ Platform 2
- 57967Stadium-Chinatown Station @ Platform 2
- 57968Main Street-Science World Station @ Platform 2
- 57969Commercial-Broadway Station @ Platform 4
- 57970Nanaimo Station @ Platform 2
- 5797129th Avenue Station @ Platform 2
- 57972Joyce-Collingwood Station @ Platform 2
- 57973Patterson Station @ Platform 2
- 57974Metrotown Station @ Platform 2
- 57975Royal Oak Station @ Platform 2
- 57976Edmonds Station @ Platform 2
- 5797722nd Street Station @ Platform 2
- 57978New Westminster Station @ Platform 2
- 57979Columbia Station @ Platform 2
- 57980Scott Road Station @ Platform 2
- 57981Gateway Station @ Platform 2
- 57982Surrey Central Station @ Platform 2
- 57983King George Station @ Platform 2
- 57984King George Station @ Platform 1
- 57985Surrey Central Station @ Platform 1
- 57986Gateway Station @ Platform 1
- 57987Scott Road Station @ Platform 1
- 57988Columbia Station @ Platform 1
- 57989New Westminster Station @ Platform 1
- 5799022nd Street Station @ Platform 1
- 57991Edmonds Station @ Platform 1
- 57992Royal Oak Station @ Platform 1
- 57993Metrotown Station @ Platform 1
- 57994Patterson Station @ Platform 1
- 57995Joyce-Collingwood Station @ Platform 1
- 5799629th Avenue Station @ Platform 1
- 57997Nanaimo Station @ Platform 1
- 57998Commercial-Broadway Station @ Platform 3
- 57999Main Street-Science World Station @ Platform 1
- 58000Stadium-Chinatown Station @ Platform 1
- 58001Granville Station @ Platform 1
- 58002Burrard Station @ Platform 1
- 58003Waterfront Station @ Platform 1
Frequently asked questions
Is the Expo Line running normally right now?
There are currently 10 active TransLink alert(s) for the Expo Line. Check the service alerts section on this page for details.
Are the train positions on this map live?
They are estimated from the timetable. TransLink does not currently publish real-time GPS positions for SkyTrain, SeaBus or West Coast Express, so VanTransit draws each train where the schedule says it should be.
How do I see the next train at my station?
Tap any station on the map or in the list below. Station pages show the next departures in each direction.